Here we are to continue with the construction of Luke's yard. Today we realizzzato the electrical system.
The plant will be powered by DCC.
I proceeded to solder the power wires to the soles of the tracks to hide them from view when the roadbed will be laid, this operation was carried out by Charles and Luke for the necessary precautions (the kids always have a hand where should not be).
The plant will be powered by DCC.
I proceeded to solder the power wires to the soles of the tracks to hide them from view when the roadbed will be laid, this operation was carried out by Charles and Luke for the necessary precautions (the kids always have a hand where should not be).
Trade Atlas has a heart that can polarize metal with the help of a switch so I used the convenient electrical contact is already available in the exchange needed to pay off the wire.
Together, we then carried out by placing the electrical wires in an orderly manner (which his father is quite rare) grouped by color (blue-green for binary, gray for the heart of switches) and fitted a bulb for the plant proteggetre by short circuit.
wiring diagram of the bulb is taken from this site www.fremo.it.
Now wiring is complete we can begin to play!!
0 comments:
Post a Comment